| SAILBOATS INC. Work Request |
| Cleaning & General Maintenance |
|
|
|
|
|
Wash Deck |
Boat Wash & Bleach |
$2.50
|
per foot |
|
|
|
Wash Hull |
Boat Wash & Bleach |
$2.50
|
per foot |
|
|
|
Acid Clean Water Line |
for highly scaled boats |
$5.00
|
per foot |
|
|
|
Buff & Wax Hull |
3m Restorer/Wax Machine Buffed (incl. wash) |
$20.00
|
per foot |
|
|
|
Wax Hull Only |
Good condition hulls only - machine buffed |
$10.00
|
per foot |
|
|
|
|
Outcome depends on condition of hull at the start. Some
hulls will come out blotchy if heavily oxidized. |
|
|
|
|
|
|
|
| Anti-Fouling Bottom Paint - two Coats of paint on
bottom, centerboard and rudder |
|
|
|
|
Includes pressure wash of bottom, light scrubbing with
scotch brite pad, labor, hoist, taping of water line,
all materials and tax |
|
|
|
|
|
|
|
|
|
VC-17 |
Racing |
Interlux |
$35.00
|
per foot |
|
|
|
|
|
Original(gray/black)____, Red)____, Blue____ |
|
|
|
|
Ablative |
Soft |
Hydrocoat by Pettitt |
$42.00
|
per foot |
|
|
|
|
|
Blue___, Red___, Black___, Green____ |
|
|
|
|
Ablative |
Hard |
Vivid by Pettitt, Trinidad SR |
$47.00
|
per foot |
|
|
|
|
|
Unlimited colors (if mixed add $150 per job) |
|
|
|
|
Epoxy |
Barrier |
Interlux 2000 |
$12.00
|
per foot |
|
|
|
|
|
like-new boats & with bottom paint only |
|
|
|
|
|
Other Bottom Paint |
|
|
Hourly Rate, Hoist Time & Materials/tax |
|
|
|
Removal of Old Bottom Paint - Outsourced only |
|
Quoted upon request |
|
|
|
|
|
Soda Blasting @ cost - Prep, PU/delivery & cleanup @
hrly rate |
|
| Motor |
|
|
|
|
|
|
|
|
Winterize Motor |
replace all fluids, gap spark plug & fog |
$89.00
|
plus materials |
|
|
Remove and replace remote motor for storage |
$89.00
|
|
|
|
|
Remove & Clean Carb - test run |
$89.00
|
plus materials |
|
|
Other Motor Work |
|
at hourly rate |
|
|
| Sails |
|
|
|
|
|
|
|
|
Inspect Sails for repairs |
$35.00
|
each |
|
|
|
Send Sails out for Repair Locally |
Outsourced |
at cost |
|
|
|
Send Sails to Sailcare for restoration and repair |
$35.00
|
ea. & shipping |
| Trailer |
|
|
|
at hourly rate |
|
|
|
|
Check & Rewire Lights |
|
|
|
|
|
Repack___ Replace ____ Wheel bearings and races |
|
|
|
|
|
Check____, Replace ____ Brakes |
|
|
|
|
|
Check ____, Replace ____ Winch ___ Rope/cable _____ |
|
|
|
|
|
Replace Bunk Carpet |
|
|
|
|
|
|
Replace Bunk Boards |
|
|
|
|
|
Other |
|
|
|
|
|
| Rigging - see separate sheet for rates |
|
|
|
|
|
Standing |
|
|
at hourly rate |
/tool charge |
|
|
|
Inspect & recommend |
|
|
|
|
|
Inspect & Clean Furling Gear |
|
|
|
|
|
Running |
|
|
at hourly rate |
|
|
|
|
Inspect & Recommend |
|
|
|
|
|
Winches |
|
|
at hourly rate |
|
|
|
|
Rebuild only |
|
|
|
|
|
|
Remove & Rebuild |
|
|
|
|
| Electrical |
|
|
at hourly rate |
|
|
|
|
Inspect & repair/
replace running lights |
|
|
|
|
|
Inspect & repair/replace mast lights |
|
|
|
|
|
Inspect & repair interior electrical |
|
|
|
|
|
Remove, charge and replace battery for storage |
$30.00
|
per battery |
| Deck |
|
|
|
at hourly rate |
|
|
|
|
Inspect & caulk chain plates |
|
|
|
|
|
Remove & reset mast step |
|
|
|
|
|
Inspect & remount other deck hardware |
|
|
|
| SAILBOATS, INC. - Service Rates |
| Effective February 10, 2010 |
| Rates May Change at Any Time |
|
| |
|
|
|
|
|
| Service Rates |
|
|
|
|
|
Minimum Labor Charge |
|
$30.00
|
|
|
Labor Rate |
|
|
$89.00
|
per hour |
|
Unscheduled Work |
|
$12.00
|
per hour additional |
|
Weekends, Evenings and Holidays |
$133.50
|
per hour |
|
|
If Boat in for repairs is excessively dirty, inside or out, boat may be cleaned. Tdime & materials will be
charged. |
| |
|
|
|
|
|
| Service Call - plus hourly labor rate for time on the
job |
|
|
|
Eagle Creek |
Service Call for Each Job is Reduced by 30% for two jobs
and by 50% for three or more jobs scheduled for the same
time |
$50.00
|
|
|
Geist |
|
$70.00
|
|
|
Prairie Creek |
$100.00
|
|
|
Monroe |
|
$150.00
|
|
|
Other areas |
|
by quote |
|
| |
|
|
|
|
|
| Estimates |
for Insurance or quote for work - valid for 60 days |
$89.00
|
in advance |
|
|
Estimate is based on our inspection and does not cover
any additional parts or labor which may be required
after the work has been started. Occasionally, worn or
damaged parts are discovered which may not be evident on
the first inspection. Because of this, the estimate is
not guaranteed. Quotations on parts and labor are
current and subject to change. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
| Hauling (including Haul Out) |
|
|
|
|
One Man & Truck |
Time begins at hitch up or when leaving shop. Time ends
at unhitch or back to shop. No Service Call Fee. |
$120.00
|
per hour |
|
Two Men & Truck |
$200.00
|
per hour |
| |
Small Trailer |
Cats & Dinghy |
$25.00
|
per hour extra |
|
E-Z Loader Trailer |
Boats up to 27' - 7,500 lbs |
$50.00
|
per hour extra |
|
Long Distance Hauling |
Load on Customer Trailer |
$1.75
|
per mile |
|
|
|
Return trip - no trailer |
$0.75
|
per mile |
| |
|
|
|
|
|
| Other |
|
|
|
|
|
|
Hoist |
|
labor rate not included |
$89.00
|
per boat - flat rate |
|
|
|
boat in lift |
$50.00
|
per hour |
|
|
|
|
$200.00
|
daily rate |
|
Hydraulic Cradle Trailer |
labor rate not included |
$50.00
|
per hour |
|
|
|
|
|
|
| Work will be completed in the order that it is received
whenever possible. Emergencies and new boat deliveries
could change the work order. Due to the nature of the
work and the unpredictability of what needs to be done,
Sailboats, Inc. cannot promise completion dates. Please
restrain from calling to see when your work will be
completed, that only takes time and delays work in
progress for everyone. Sailboats, Inc. will call you
when your boat is finished. |
| Sailboats, Inc. reserves the right to refuse any work. |
|
Some Work May be Outsourced |